Field-Erected Cooling Tower Installation
A field-erected cooling tower (FEP) is supplied as prefabricated components and assembled on site, which makes it suitable for large cooling capacities. Stolz Engineering, the official distributor of Marley cooling towers in Singapore, manages the whole installation, from component delivery to on-site construction, with one point of contact. We install cooling towers in Singapore and Thailand.
What's Included
Site Survey and Planning: We survey your site and plan the construction area, component delivery and assembly sequence before work begins.
Component Delivery: We coordinate delivery of the prefabricated tower components to your site.
On-Site Construction by Our Own Team: Our own team assembles the cooling tower on site, so it’s built to Marley specifications.
Associated Works: Associated works such as lifting, piping and electrical connections are carried out by our appointed subcontractors and managed by us.
How It Works
1. Site survey: we assess your site and project requirements.
2. Planning and quotation: we plan the construction and send you a quotation.
3. Component delivery: the prefabricated components are delivered to site.
4. On-site construction: our team assembles the tower, while our subcontractors carry out the associated works.
5. Testing and commissioning: we test the tower to confirm it performs as designed before handover.
Why Work With Stolz Engineering
Official Marley Distributor
We are the official distributor of Marley cooling towers in Singapore, with direct access to Marley equipment and parts.
1,000+ Installations
Our experience includes district cooling systems, petrochemical plants, semiconductor and pharmaceutical facilities, and hospitals.
Quality and Safety Certified
Stolz Engineering is certified to ISO 9001 (quality management) and ISO 45001 (occupational health and safety management).
Frequently Asked Questions
What is a field-erected cooling tower?
A field-erected cooling tower (FEP) is supplied as prefabricated components and assembled at the project site. This differs from a factory-assembled tower (FAP), which is delivered as a complete unit or in large modules.
When is a field-erected cooling tower used instead of a factory-assembled one?
Field-erected towers are typically used for large cooling capacities, where the tower is too big to build in a factory and ship in one piece. This is common for large industrial plants and district cooling systems. Our team can advise which type suits your project.
Do you install cooling towers outside Singapore?
Yes. In addition to Singapore, we install cooling towers for customers in Thailand.
What happens after installation?
We test and commission the tower before handover. After that, we offer maintenance contracts from monthly to annually to keep it running efficiently.
Planning a Large Cooling Tower Project?
Tell us about your project, and our team will recommend the right Marley cooling tower and construction plan.